An existing conditions record you can defend

Build an existing-conditions record your team can review: equipment photos, extracted fields, drawing comparisons and the findings that still need follow-up.

An MEP existing conditions survey documents the equipment a building contains today, as distinct from what its drawings say it should contain. The software keeps the evidence attached, so each equipment record can be checked against the source photographs and recorded review.

DESIGN SCHEDULEFIELD RECORDRTU-1RTU-1MATCHRTU-3 · 15 TONRTU-3 · 12.5 TONREPLACEDAHU-2NOT FOUNDFCU-11UNDOCUMENTED

The drawing is a claim

A set of record drawings tells you what a design intended and, if you are fortunate, what was installed on handover day. It says nothing about the twenty years since. Chillers get replaced with whatever the budget allowed. A fit-out adds eight fan coils that never reach the archive.

Finding a gap during the site visit gives the team a chance to resolve it before it affects design.

What the record has to contain

01: Identity and ratings

02: Age from the serial

03: Placement

04: Relationships

05: Evidence

06: An explicit unresolved list

Where field and design disagree

  • 01: On the schedule, not in the field

  • 02: In the field, on no schedule

  • 03: Same tag, different unit

  • 04: Tag renumbered

  • 05: Location disagrees

Surveys that get questioned

These records are read under pressure — during a claim, a value engineering exercise, or a dispute about what was known at design stage. The useful question is never what does the spreadsheet say but how do you know.

Keeping the evidence attached is what makes that answerable — which photograph a capacity came from, who confirmed a condition rating, which items were flagged uncertain at the time. The process guide covers closing a survey out properly.

Before you scope one

Why can't we just use the record drawings?

Record drawings describe what was specified and, at best, what was installed on the day the job closed out. Buildings then run for decades: units fail and get replaced with whatever was available, equipment is added during fit-outs, tags are renumbered by contractors, and almost none of it is fed back into the archive. The drawing is a claim about the building; only a field survey establishes what is there now.

What makes an existing conditions record defensible?

Traceable evidence and a clear scope. Keep source photos with equipment records, document corrections and confirmations, and state what was inaccessible or uncertain. A record supports review; it does not guarantee that every condition was found.

How are gaps handled when a survey can't be completed?

Record inaccessible areas and unreadable plates as open items with a reason and next action. Review the findings before handoff so the deliverable states the limits of the survey.

Can the survey be picked up by someone who wasn't on site?

That is the point of keeping the evidence attached. The record is not one engineer's memory and camera roll — the next person can open a unit, see the photograph the values came from, see who confirmed what, and carry on.